Annual Highway Program

2023 Construction Program

This year’s Program incorporates the County's priority to maintain our existing infrastructure while at the same time implementing projects to improve safety and relieve congestion.  In 2023, approximately 71 lane miles of County highways are proposed to be patched and resurfaced to improve rideability and to extend the service life of the existing pavements.  The roadways include: 

  • Army Trail Road from County Farm Road to 84th Court
  • Army Trail Road from Schmale Road to IL 53
  • Wehrli Road/College Road from 75th Street to Maple Avenue
  • Eola Road from I-88 to IL 56 (Butterfield Road)
  • Ferry Road from Eola Road to IL 59
  • Jewell Road from County Farm Road to Gary Avenue
  • Maple Avenue from IL 53 to Belmont Road
  • Midwest Road / Summit Avenue from I-88 to IL 38 (Roosevelt Road)
  • River Road from Ferry Road to Warrenville Road

Other major projects include:

  • Bloomingdale Road over the Canadian National Railroad (bridge replacement)
  • Geneva Road over the West Branch of the DuPage River (bridge replacement)
  • Illinois Prairie Path (Volunteer Bridge) over the Union Pacific Railroad (raise bridge)
  • Lemont Road from 83rd Street to 87th Street (intersection improvements and resurfacing)
  • Naperville Road from Naperville-Wheaton Road / Ridgeland Avenue to Diehl Road (intersection improvements and resurfacing)
  • Warrenville Road over the East Branch DuPage River (bridge replacement)

The 2023 Proposed Construction Program totals $55,250,000 (all fund sources).

To view the 2023 Proposed Construction Program, click on the following link:

DuPage County Roads Currently Under Contract and/or Under Construction

For Additional Information

Call the main office at 630-407-6900 (M-F 8 a.m. to 4:30 p.m.) or click on Project Details link below for more details.

Road Construction
2023 Pavement Maintenance - North Region

Updated:
Thursday, June 1, 2023

Project Location(s)

  • CH 11 Army Trail Road (West) - County Farm Rd to 84 Court
  • CH 11 Army Trail Road (East) - Schmale Rd to IL 53

Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings.

Traffic Control

The project will be constructed primarily using daily lane closures. 

Contract Cost
$6,288,300.00

Completion Date
September 29, 2023

Construction Status

  • Army Trail Road - East:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work has begun. 
    •  


Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor R.W. Dunteman Company
600 S. Lombard Road
Addison , IL 60101
(630) 953-1500
Resident Engineer Primera Engineers
Project Engineer Steve Mlynarczyk, P.E.
DuPage County Division of Transportation
(630) 407-6900
2023 Pavement Maintenance - Central Region

Updated:
Thursday, June 1, 2023

Project Location(s)

  • CH 27 Jewell Road - County Farm Rd to Gary Ave
  • CH 14 Eola Road - I-88 to IL 56 (Butterfield Rd)
  • CH 3 Ferry Road - Eola Rd to IL 59
  • CH 1 River Road - Ferry Rd to Warrenville Rd
  • CH 43 County Farm Road - At Great Western Trail

Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings. Work at the County Farm Rd location is limited to the installation of a barrier refuge median for the trail crossing. 

Traffic Control

The project will be constructed primarily using daily lane closures. 

Contract Cost
$4,138,000.00

Completion Date
September 29, 2023

Construction Status

  • County Farm Road:
    • Saw cutting in preparation for pavement removal in the median will begin on June 2nd.
    • The Great Western Trail crossing will be closed to bicycle and pedestrian traffic with pavement removal to construct the new refuge median beginning on June 5th. 
  • Jewell Road:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work is expected to begin on June 6th. 


Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor R.W. Dunteman Company
600 S. Lombard Road
Addison , IL 60101
(630) 953-1500
Resident Engineer Chastain & Associates
Project Engineer Steve Mlynarczyk, P.E.
DuPage County Division of Transportation
(630) 407-6900
2023 Pavement Maintenance - South Region

Project Location(s)

  • CH 15 Midwest Road/Summit Avenue - I-88 to IL 38
  • CH 17 Maple Avenue - IL 53 to Belmont Rd
  • CH 17 Maple Avenue - Springside Ave sidewalk crossing
  • CH 40 Wehrli/College Road - 75th St to Maple Ave


Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings.

Traffic Control

The project will be constructed primarily using daily lane closures.

Contract Cost
$4,367,944.39

Completion Date
September 29, 2023

Construction Status

  • Wehrli/College Road:
    • The Wehrli/College Rd location has been completed.
  • Maple Avenue:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work has begun.
    • The Maple Avenue location is expected to be complete by mid September.
  • Midwest Road/Summit Avenue:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work has begun.
    • The Midwest Road/Summit Avenue location is expected to be completed by late September.

 

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor RW Dunteman Co
600 S Lombard Road
Addison, IL 60101
(630) 953-1500
Resident Engineer HW Lochner, Inc.
Project Engineer Keith Warf
DuPage County DOT
(630) 407-6900
2022 Bridge Repairs

Updated:
Friday, June 23, 2023

Project Location(s)

  • County Highway 25 Meyers Road over I-88 Reagan Tollway
  • County Highway 32 Mill Street over I-88 Reagan Tollway
  • County Highway 33 75TH Street over East Branch DuPage River
  • County Highway 34 31ST Street over Salt Creek


Short Description of Work

The project consists of minor bridge deck repairs and applying a thin polymer overlay to the surface

Traffic Control

Long term lane closures will be utilized at each bridge. The work will be staged to complete the work in each direction.

Contract Cost
$1,459,743.33

Completion Date
Fall 2023

Construction Status

  • County Highway 32 Mill Street over I-88 Reagan Tollway-Construction is scheduled to begin in early August, 2023.


Plans, Special Provisions and Bid Details

Link to plans, special provisions and bid details

Function/Role Responsible Party
Contractor ERA-Valdivia Contractors, Inc.
11909 South Avenue O
Chicago, IL 60617(773)-721-9350
Resident Engineer Bowman Consulting Group
1001 Warrenville Road, Suite 110
Lisle, IL 60532
Project Engineer Thomas Hardy, P.E.
DuPage County Division of Transportation
(630)-407-6900
Designer H.W. Lochner, Inc.
225 West Washington Street
12TH Floor
Chicago, IL 60606
2022 Pavement Maintenance - South Region

Updated:
Wednesday, March 8, 2023

Project Location(s)

  • CH 2 Hobson Road - Washington St to EB DuPage River
  • CH 35 55th Street - Holmes Ave to County Line Rd
  • CH 40 Yackley Avenue - Oak Hill Dr to Warrenville Rd


Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings.

Traffic Control

The project will be constructed primarily using daily lane closures.

Contract Cost
$4,572,458.59

Completion Date
July 15, 2023

Construction Status

  • Hobson Road:
    • The Hobson Rd location has been completed.
  • Yackley Avenue:
    • The Yackley Ave location has been completed.
  • 55th Street:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work has been completed. 
    • The 55th Street location will resume work beginning June 12, 2023. 


Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor K-Five Construction Corporation
999 Oakmont Plaza Drive, Ste. 200
Westmont, IL 60559
(630) 267-5600
Resident Engineer ESI Consultants, Ltd.
Project Engineer Keith Warf
DuPage County DOT
(630) 407-6900
75th Street - Millbrook Drive to Greene Road

Updated: Thursday, June 1, 2023

Project Location(s)

County Highway 33     75th Street

Between Millbrook Drive and Greene Road

Short Description of Work

The project involves intersection improvements at four locations along 75th Street including:

  • The addition of eastbound and westbound right turn lanes at Modaff Road, Olympus Drive, and Greene Road.
  • The addition of an westbound right turn lane at Millbrook Drive.
  • Eastbound and westbound left turn lane modifications at Modaff Road, Olympus Drive, and Greene Road.
  • Replacement of the traffic signals at Millbrook Drive, Modaff Road, Olympus Drive, and Greene Road.
  • Sidewalk and curb ramp improvements at Millbrook Drive, Modaff Road, Olympus Drive, and Greene Road.


Traffic Control

Short term overnight lane closures will be utilized at each intersection to construct the improvements. The work will be staged to complete the construction of the right turn lanes first, followed by the left turn lane modifications. The new traffic signals will be constructed utilizing daily lane closures.

Contract Cost
$4,524,976.55

Completion Date
80 Working Days are allowed per the special provisions.

Construction Status

  • Work began the week of April 11, 2022.
  • Temporary traffic signals have been installed at all four intersections.
    • The temporary signals were turned on at Millbrook Dr. and Modaff Rd on 5/19.
    • The temporary signals were turned on at Olympus Dr. and Greene Rd on 5/20.
  • The contractor has completed the construction of the new right turn lanes, left turn lane extensions, and sidewalks at all four intersections
  • The electrical contractor has completed removal of the existing traffic signals and installation of the underground components for the new traffic signals at all four intersections.
  • Installation of the remaining above ground traffic signal equipment has been completed and the new traffic signals have been turned on. 
  • Temporary traffic signals have been removed and the contractor is completing some various punch list work. 

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor Alliance Contractors, Inc.
1166 Lake Avenue
Woodstock, IL 60098
(815) 338-5900
Resident Engineer BLA, Incorporated
333 Pierce Road, Suite 200
Itasca, IL 60143
Project Engineer Steve Mlynarczyk, P.E.
DuPage County Division of Transportation
(630) 407-6900
Designer Bowman Consulting Group, Ltd.
1001 Warrenville Road
Suite 110Lisle, IL 60532
87th Street at Woodward Avenue
  • Updated: Thursday, January 11, 2024

    Project Location(s)

    County Highway 31: 87th Street/Boughton Road (from the Costco entrance to east of Havens Drive)

    County Highway 56: Woodward Avenue (from 87th/Boughton to 700' north)

    Woodward Avenue (non-County Highway portion) (from 87th/Boughton to Union Street)

    Short Description of Work

    The project includes pavement widening in order to provide an additional left turn lane in the northbound, eastbound, and westbound directions (since there are already single left turn lanes, they will become dual left turn lanes) and additional right turn lanes in the eastbound and westbound directions at the 87th/Boughton and Woodward intersection.  Work also includes a new traffic signal at this intersection, traffic signal modifications at the Costco entrance, storm sewer improvements, sidewalk improvements, lighting modifications, and retaining walls.

    This project is a joint effort between DuPage County and the Illinois Department of Transportation. 

    Traffic Control

  • Pre-Stage: Daytime lane closures will be used while temporary traffic signals are installed, and existing raised medians are removed and replaced with temporary pavement.
  • Stage 1: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will be closed in each direction as work is performed on the north and east sides of the roads.
  • Stage 2: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the south and west sides of the roads.
  • Stage 3: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the medians.
  • Stage 4: As the roadway is milled and resurfaced, lanes will be opened to the final configuration.

  
Contract Cost
4,371,729.42

Completion Date
110 Working Days

Construction Status

Stages 1, 2, and 3 are substantially complete, with some sidewalk, fence, railing, and landscaping to be completed.

All lanes are open for the winter (2023/2024). Daily lane closures will be used for some winter work, and for resurfacing and project completion in Spring 2024.

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor

Alliance Contractors, Inc.
1166 Lake Ave.
Woodstock, IL  60098
(815) 338-5900

Resident Engineer

STV, Inc.
Chicago, IL

Project Engineer

Kent Kuper, P.E.
DuPage County Division of Transportation
(630) 407-6900

Designer Engineering Resource Associates, Inc.
Warrenville, IL